MEPCO New Electricity Connection Demand Notice 2026 – Complete Guide

MEPCO New Electricity Connection Demand Notice 2026

Getting a new electricity connection from Multan Electric Power Company (MEPCO) in 2026 involves a proper application process. The most important step in this process is receiving the Demand Notice, which is an official bill issued by MEPCO. This notice includes all charges related to meter installation, security deposit, and service line costs.

Whether you are applying for a domestic, commercial, or industrial electricity connection, understanding how the MEPCO Demand Notice works can save you time and confusion.

PointDetails
Power CompanyMEPCO
Year2026
Key DocumentDemand Notice
Application MethodENC system or MEPCO office
Domestic Cost RangeRs. 10,000 – Rs. 15,000
Meter TypeConventional or Smart Meter
Payment BanksNBP, HBL, MCB
Installation Time10–30 days

What Is a MEPCO Demand Notice?

A MEPCO Demand Notice is an official payment slip issued after your electricity connection application is approved. Without paying this notice, MEPCO does not install the electricity meter.

Important points about the demand notice:

  • It includes installation charges
  • It includes a security deposit
  • It includes service line and meter costs
  • It is different for urban and rural areas
  • It depends on your electric load requirement (KW)

Once issued, the demand notice must be paid within the given time to avoid delays or cancellation.

How to Apply for a New MEPCO Electricity Connection

You can apply for a new electricity connection through two main methods: online or in person.

The application process includes:

  • Apply online through the Electricity New Connection (ENC) system
  • Or visit your local MEPCO subdivision office
  • Fill in personal and property details
  • Select connection type (domestic, commercial, industrial)
  • Submit the application and wait for verification

Online applications are faster and allow you to track your request easily.

Required Documents for MEPCO Demand Notice

To avoid rejection or delay, all documents must be correct and complete.

You need the following documents:

  • Copy of CNIC of the applicant
  • Property ownership proof (registry or allotment letter)
  • Affidavit stating no previous electricity dues
  • Copy of a witness’s electricity bill
  • Site location details and contact number

All documents must be uploaded on the ENC portal or submitted to the MEPCO office.

Site Survey and Issuance of Demand Notice

After document verification, MEPCO conducts a site inspection.

This step includes:

  • Visit by a MEPCO technical officer
  • Checking availability of nearby electricity lines
  • Estimating required material and load
  • Confirming meter type (normal or smart meter)

Once approved, the Demand Notice is generated. You usually receive an SMS notification informing you that the notice is ready for printing.

MEPCO Demand Notice Charges and Payment Method

The cost mentioned in the demand notice depends on load and area.

Estimated charges for 2026 include:

  • Domestic single-phase: Rs. 10,000 to Rs. 15,000
  • Commercial connections: Higher charges based on load
  • Industrial connections: Much higher due to heavy power needs
  • Smart meters (AMI): Higher initial cost than normal meters

Payment instructions:

  • Pay the demand notice at NBP, HBL, or MCB
  • Keep the paid receipt safe
  • Upload the paid notice on the ENC portal
  • Or submit a copy to the MEPCO subdivision office

After payment verification, the connection process starts.

Meter Installation and Application Tracking

Once payment is confirmed, MEPCO schedules the installation.

Key points include:

  • Meter installation usually takes 10 to 30 days
  • Time depends on workload and technical conditions
  • Both single-phase and three-phase meters are installed
  • Smart meters are being introduced in some areas

You can track your application status online by using your tracking ID or CNIC on the official ENC tracking page:
 👉 https://enc.com.pk

Conclusion

The MEPCO Demand Notice 2026 is a mandatory step for getting a new electricity connection. From application submission to site survey, payment, and meter installation, each step must be completed carefully. Charges vary based on load, location, and meter type, while proper documents help avoid delays. By following the correct process and using official platforms, applicants can receive their electricity connection smoothly and on time.

FAQs

Q1: How long does it take to receive a MEPCO Demand Notice?
 It usually takes 7 to 14 days after application submission and site survey.

Q2: Can I apply for a MEPCO connection online?
 Yes, you can apply through the ENC online system.

Q3: What happens if I do not pay the demand notice on time?
 Your application may be delayed or cancelled.

Q4: Are smart meters compulsory for new connections?
 Not everywhere. Smart meters are being introduced in selected areas only.