Latest News Winter Gas Load-Shedding Schedule 2025 Announced by SNGPL


Winter Gas Load-Shedding Schedule
As winter intensifies across Pakistan, Sui Northern Gas Pipelines Limited (SNGPL) has officially issued the Winter Gas Load-Shedding Schedule 2025 to manage the rising seasonal gas demand. The new schedule aims to balance limited gas supply, control pressure drops, and ensure fair distribution to all domestic consumers throughout the cold months.
Why the Schedule Was Introduced
Every winter, millions of households in Pakistan increase their gas use to operate heaters, geysers, and stoves. This sudden spike in demand drastically reduces gas pressure, causing severe shortages in many areas. Since available gas reserves and supply capacity cannot meet the seasonal surge, SNGPL has introduced a structured supply timetable.
This schedule helps:
- Maintain stable gas pressure
- Prevent complete outages
- Ensure equal supply to all connected homes
- Reduce complaints from consumers facing unexpected shortages
SNGPL also emphasized that illegal gas connections, gas theft, and leakages significantly worsen the crisis, urging citizens to report any suspicious activity.

New Gas Supply Timings for Winter 2025
Under the new load-shedding plan, domestic users will receive gas only during three daily time slots. These timings apply across all major SNGPL-served regions including Lahore, Islamabad, Rawalpindi, Faisalabad, Multan, and surrounding areas.
Daily Gas Supply Schedule 2025
| Time Slot | Supply Hours | Common Usage |
| Morning | 05:30 AM – 08:30 AM | Breakfast cooking, geyser heating |
| Afternoon | 11:30 AM – 01:30 PM | Lunch preparation, midday heating |
| Evening | 05:30 PM – 08:30 PM | Dinner cooking, evening heating |
Outside these hours, gas pressure will remain low or supply may be suspended temporarily.
SNGPL’s Official Statement on the Plan
According to SNGPL’s announcement, the schedule is essential for maintaining fair and uninterrupted distribution during the high-demand months of December, January, and February.
Key points from SNGPL:
- The schedule ensures equal distribution of limited winter gas supply.
- Consumers must adjust their routines according to the announced timings.
- Any irregularities such as gas theft, leakage, or illegal pipelines should be reported immediately.
- The schedule is subject to modification depending on temperature drops, supply changes, or system pressure improvements.
Challenges Behind the Winter Gas Crisis
Pakistan faces a long-standing imbalance between gas consumption and supply:
- Winter gas demand increases by nearly double in northern regions.
- Domestic gas reserves are declining over time.
- Illegal connections and leakages cause major losses.
- The pipeline network struggles to maintain pressure during peak hours.
Because of this, load-shedding becomes necessary to prevent complete system failure.
Tips to Manage Gas Usage During Limited Supply Hours
To help households adjust more comfortably, SNGPL suggests the following:
✔ Plan Ahead
Cook meals, heat water, and run geysers within the provided time slots.
✔ Use Energy-Efficient Appliances
Modern stoves, instant geysers, and room heaters can save fuel and reduce pressure on the system.
✔ Avoid Leaving Gas Heaters On Overnight
This wastes fuel and poses safety risks; consider electric or alternative heating.
✔ Turn Off Appliances Properly
Ensure all burners and heaters are switched off after use to avoid leaks.
✔ Report Issues Immediately
Gas theft, damaged lines, or leakage must be reported to maintain stable supply.
Possible Future Changes to the Schedule
SNGPL confirmed that the current timings may be revised if:
- Weather becomes severely cold
- Gas availability decreases or increases
- New supply measures or imports improve pressure
- Maintenance work affects major pipelines
If changes occur, consumers will be notified through SMS alerts, local media updates, and official announcements.
FAQs
1. Will this schedule apply to all cities under SNGPL?
Yes. The announced timings apply to all major cities and towns served by SNGPL, including Lahore, Islamabad, Rawalpindi, Faisalabad, and others.
2. Is the gas schedule permanent?
No. It is a temporary winter schedule and may be modified depending on gas availability and weather conditions.
3. How can households reduce gas consumption during winter?
By using energy-efficient appliances, planning cooking and heating during scheduled supply hours, and reporting gas leaks or theft to help stabilize the system.
Final Word
The Winter Gas Load-Shedding Schedule 2025 reflects SNGPL’s efforts to manage Pakistan’s winter gas crisis in a fair and balanced way. Although reduced supply hours may cause inconvenience, cooperation from citizens, responsible usage, and timely reporting of issues can help maintain steady gas pressure. With collective effort, households can experience a safer and more manageable winter season.
Latest Updates
BISP 8171 Check by SMS 2026 New Registration Method and CNIC Verification Guide
Big News: 8070 Ramzan Relief Package 2026: How to Check Eligibility for Free Ration & 10,000 Cash.
Breaking News: Prize Bond Draw Schedule 2026 – Complete Guide for All Denominations
Breaking: Punjab Government Ramadan 2026 Preparations: Bazaars, Facilitation Centers & 8070 PSER Registration
Big Update: NADRA Smart ID Card 2026 – New Fees and Fast-Track Delivery
News Alert: How to Check CM Punjab Honhar Laptop Scheme Phase 2 Merit List Online






